This was our first dome. It was built for Jason and Amanda Slick in McMahan, TX. Thank you to Travis Lott for lots of hard work on this. Also thanks to Jesse Garrett for helping out. Amanda also did her fair share. Jason did a whole lot of work on this dome, doing most of the finishing himself. The dome was built between December 2008 and February 2009.
|
|
|
|
 |
|
|
 |
Prepared the footing form |
 |
|
|
|
|
|
|
|
 |
|
|
 |
The ready mix truck has arrived |
 |
|
|
|
|
|
|
|
|
|
|
 |
|
|
 |
Inserting the rebar that ties the footing to the shell |
 |
|
|
|
|
|
|
|
 |
|
|
 |
Keyway (to join the footing to the shell well) |
 |
|
|
|
|
|
|
|
|
 |
|
|
 |
rebars bent down to prepare for airform |
 |
|
|
|
|
|
|
|
 |
|
|
 |
Inside the dome (just the airform) |
 |
|
|
|
|
|
|
|
 |
|
|
 |
polyurethane has been sprayed and these are rebar hangers |
 |
|
|
|
|
|
|
|
|
 |
|
|
 |
second layer of concrete covering the rebar |
 |
|
|
|
|
|
|
|
|
|
|
|
|
|